Ahead of Time

  • info@caspel.uz
  • City of Tashkent, Yashnobod District, Cholpon Neighborhood (Choʻlpon MFY), KXAY Street, 36

Oguz-Gabala-Baku water pipeline

The main pipe of the Baku-Oguz-Gabala water pipeline system has been fully automated. Level gauges measuring water consumption, as well as a system of pressure and temperature transmitters are installed. Full automation of two local points on the 31st and 153rd km of the water pipeline was carried out.

A water loss detection system was installed on the pipes, which allows to accurately localize the damaged area within 250 meters. An optical-fiber cable system has been laid along the entire length of the water pipeline. A special room was built and equipped with the necessary equipment for the centralized management of the water pipeline system.

In the process of developing the software system, the SKADA software interface system was developed and the equipment for its operation was installed. Artesian wells have been fully automated in Oguz-Sheki region.

YOUR AUTOMATION PARTNER

Choose us for professional solutions!